Soroosh & Bahregan

EST. 2016
SPS Shipping
SOROOSH/NOWROOZ TERMINAL (FSU)

Acceptance criteria for vessels calling FSU KHALIJ-E-FARS
The following criteria should be applied when determining the suitability of vessels nominated for loading at the floating storage unit KHALIJ-E-FARS. The points covered should be considered as the minimum requirements.
According to water depth 42 meters then there are no draft restrictions at SOROOSH terminal.
According to max deadweight 330,000 tons then there is no arrival displacement restrictions. Just vessel should arrive with arrival draft of under 20.00 meters.
There are no air height restrictions at FSU KHALIJ-E-FARS.
Original dwt is not applicable at SOROOSH/NOWROOZ terminal.
Only vessels of between 80,000 and 330,000 dwt can be loaded in tandem mooring configuration.
Vessels must comply with the OCIMF ”recommendations for equipment employed in the mooring of ships at single point moorings”. N.B. only 76 mm bow stopper can be accepted.
Vessel must be capable of accommodating 200 meters of 10-inch messenger line onto a single drum of the mooring winch when retrieving the bow mooring hawser. The winch drum should be cleared of all other wires or ropes prior to commencing mooring operations.
Vessels must be equipped with a amidships, port side cargo manifold that complies with the OCIMF ”recommendations for oil tanker manifolds and associated equipment”.
Vessels must be equipped with a port side crane or derrick with a minimum safe working load (SWL) of 15 tons for handling loading hoses.
Vessels must be equipped with operational inert gas system.
Vessels must be capable of loading cargo in closed loading mode (CLM).
If required to d-ballast, only CBT (clean ballast) or SBT (segregated ballast) vessels can be accepted. Furthermore, the vessel must be equipped with operational ODME.
Combination carries (obo) wherever possible should be discouraged. Such vessels should only be accepted for loading if the buyer can provide evidence (declaration) of crew competency in crude oil operations and confirm that the vessel has recently been engaged in crude oil operations e.g. last 2 cargoes carried.
Accommodation ladders used for berthing master embarkation must be aft facing i.e. approach direction from the stern of the vessel.
Position:
Geographic location of F.S.U. (SOORENA)
Lat. 29° 07′ 23’’ n.
Long. 49° 28′ 57’’ e.
Tankers anchorage position:
– lat. 29° 06′ n. Long. 49° 35′ e (pilot station)
– lat. 29° 04′ n. Long. 49° 35′ e
– lat. 29° 06′ n. Long. 49° 37′ e
– lat. 29° 04′ n. Long. 49° 37′ e
Additional info:
Only daytime berthing navigation is available.
Average LDG rate is ABT 20-25,000 BBLS per hour
Hose connections 1 x 16” (3 to 4 hours connecting time required)
Location is 30 minutes from KHARG island by helicopter.
Cargo supplies via mothership ‘KHALIJ-E-FARS’.
API is around 20.00
Vessels will be berthed head to aft. By 50 meters’ distance and end of exporting vessel is fixed using a tugboat.
Capacity of F.S.U. ‘KHALIJ-E-FARS’ is 2,200,000 BBLS.

Bahregan Terminal

Acceptance criteria for vessels calling BAHREGAN terminal (SBM)
The following criteria should be applied determining the suitability of vessels nominated for loading at the S.B.M the points covered should be considered as the minimum requirements.
BAHREGAN S.B.M terminal location:

lat. 29 deg. 43 min. 02.5 sec north
long. 050 deg. 09 min. 46.1 sec east
Mooring:(double hawser) joint at port bracket.
Departure displacement: 250,000 tons.
Max. Sailing draft: 20 – 21 meters.
Max. L.O.A: 340 meters.
Arrival draft: in normal ballast condition.
Berthing operation: berthing operation will carry out only
From sunrise to sunset, unless terminal’s exceptional decision.
Un–berthing operation: 24 hours
The weather condition that normally result in port closure can in
general term be defined as follows:
Wind speed in excess of 20knots. Swell height in excess of 3 feet.
Visibility reduced to 3 nautical miles or less.
Vessels must be equipped with an amidships port side cargo manifold that complies with the OCIMF recommendations for oil tanker manifolds and associated equipment.
Vessels will be secured with 1 hawser from SBM to the port bow of tanker.
Vessels must be equipped with a port side crane or derrick with min. Safe working load (SWL) of 10 tons handing cargo hose.
Only one 16″ inch flexible floating hose will be connected to the ships portside manifold.
Vessels must be equipped with operational inert gas system.
Vessels must be capable of loading cargo in closed loading mode (CLM).
If required to de-ballast only CBT (clean ballast) or SBT (segregated ballast) vessels can be accepted furthermore the vessel must be equipped with operational ODME.
Geographical poison of shipwreck at distance 0.8 miles from 210sw of S.B.M terminal with latitude 29 deg. 42 min. 56 sec. North and longitude 50 deg. 09 min.47sec. East.
Geographical position of shipwreck “IRAN RESHADAT” at distance 6 miles from S.B.M with latitude 29 min. 50 sec north and 50 min. 9 sec east.
BOC terminal maintains a listening watch 24 hours on vhf channel 11 & SSB 2638.
Loading connection: 1 x 16” flexible hose loading rate 20000 to 23000 BBLS.